The frame of the modules is made of planed timber 90x120 and 45x75 mm, treated with an anti-rotting compound. We use coniferous wood (pine, spruce). The frame is designed for temperature conditions and snow load on the roof typical for the Balkans.
Outside: metal sheets and façade board over sheathing with ventilation gap + paint, terrace board + terrace oil.
Inside: decorative board on the sheathing with a ventilation gap + water-based paints and varnishes,
tiles or PVC panels in the bathroom.Metal entrance door 800x2050 mm
Wooden interior doors 700x2050 mm
Panoramic windows 810x1900 mm with double-glazed windows, frame material - wood
Glazed door to the terrace 800x2050 mm
Sink, toilet, shower, boiler, heated towel rail, convectors. Our houses are heated with electricity - due to their space and energy efficiency, this is the most suitable option for them.
Furniture and household appliances are not included.
All communications are hidden inside the walls and floor.
Lamps, sockets with ceramic base, fireproof halogen-free copper cables. Electrical panel: 3 phases at the input, voltage control device, automatic switches: for lighting - 10A, for sockets - 16A.
Water pipes made of Polypropylene 20 and 32 mm (connection to the external system - 32 mm), collector unit for uniform pressure in the system. There are places to connect a kitchen sink, washing machine and dishwasher.
Sewerage from PVC pipes 110 and 50 mm (connection to the external system - 110 mm).
Ventilation ducts in the kitchen and bathroom, with the ability to connect a forced exhaust hood and an inverter (air conditioner).
Warranty on supporting frame - 20 years
Warranty on communications - 10 years
Warranty on finishing materials - 24 months
Warranty for electrical appliances and plumbing - 12 months (due to limited warranty obligations of suppliers providing these items)
Our service department provides warranty and post-warranty service for your home.
The site must have a water source, electricity and sewerage. Before installing the house, it is necessary to bring them to the point of installation of the house - independently according to the scheme agreed with us or by ordering this service from us.
Our specialist gives recommendations on preparing the plot for installation when visiting the plot after concluding the contract for free. For any house, you will need to connect external networks to the installation point (water, electricity, sewerage) and organize entry to the site. You can prepare the site for installation yourself according to our recomendations or order these services from us.
Access roads must ensure unimpeded passage of large equipment to the site. The width of the road and gate should be at least 3.6 m, the height to the wires above the road should be 4.5 m.
The equipment (crane/manipulator) must freely travel to the site where the house will be installed. Be mentally prepared for some damage to the landscape, garden paths, etc. - the crane/manipulator will not be able to pass without a trace, unfortunately. If the site and/or access roads are not ready and the modules are delivered for installation, you need to remove all obstacles and pay the cost of downtime for equipment and the installation team.
Usually within 24 hours all modules are installed on the foundation, then work is carried out on switching the modules, connecting the house to external networks, and final interior and exterior finishing.
Installation takes from 3 to 14 days, depending on the model of the house, the readiness of the site for installation and favorable weather conditions. In winter, after installation, the house must be gradually warmed up for two weeks. It is not recommended to immediately turn on the convectors and heat the stove to full. Our specialists connect the house to external networks, since it is necessary to check the functioning of the entire system. If communications are connected to the foundation before installation begins, the team will connect the house to external communications during the installation process, but if communications are not prepared, it will be necessary to order an additional visit from an employee.